Skip to Search Skip to Content
  • Share
    • Email to a Friend
    • Subscribe to eGov News
    • Blinklist
    • Blogger
    • Del.icio.us
    • Digg
    • Facebook
    • Google Bookmarks
    • Linked In
    • Myspace
    • Stumble Upon
    • Twitter
    • Yahoo Bookmarks
  •  | 
  • Print
More Information
  FAQ  | Contact  | Notifications  | Site Index  | Calendar  | RSS Feeds
Wagoner County
Visit OK.gov
  • Elected Officials
  • Emergency Services
  • Planning and Zoning
  • Courts
  • Boards, Trusts & Commissions
  • About Wagoner County
Home / Map Viewer
Map Viewer Home |  Log In

D1 - Road and Bridge Projects - old

Browse All |  By Type |  By Department |  By Topic |  By Category |  By Name

D1 - Road and Bridge Projects - old


SELECT AN ICON FOR DETAILS
Map Canvas


Legend

Road PlanningRoad inWorkRoad CompletedBridge PlanningBridge inWorkBridge Completed


MAP DETAILS
  • mapTop
    mapTop
  • Resurfacing 71st Street

    Description: Road Project - Resurfacing

    Completed 2013

    Problem/Solution: Once this project is completed we will be able to come in and make more permanent repairs to that roadway. We do understand your frustrations and we Thank you for your patience.

    Learn More


    201306-E 71st St S from S 273rd E Ave to S 305th E Ave
  • 337th and 129th Which Is Deer Crossing III

    Description: Road Project

    Completed 2013

    Description: 129th was previously a dirt road with several pot holes we have since Chip and oiled all of 129th onto part of 337th.

    Learn More


    201303-S 337th E Ave and E 129th St
  • Restriping Various Roads

    Description: Road Project

    Completed 2012

    Problem: The original striping, on various roads in District, faded.

    Solution: Roads were re-striped for public safety, to help traffic flow at night and during storms.

    Learn More


    201212-Restriping Various Roads
  • 289th (15th-16th)

    Description: Road Project

    Completed 2013

    Problem: There was no roadway at 289th E. Ave between 15th and 16th.

    Solution: Trees and shrubs were cleared out and a new roadway was established. The road was built up with proper materials and drainage was added.

    Learn More


    201312-S 289th E Ave from E 15th St to E 16th St
  • Oneta (241st E Ave)

    Description: Road Project

    Completed 2012

    Problem: The Road was functionally obsolete, narrow, and unstable to sustain road materials. The creek would rise on to the embankment of the road, which caused flooding.

    Solution: The embankment was protected and the road was elevated to prevent flooding. Protecting the embankment and elevating the road provided a wider, safer road for emergency vehicles, school busses, and the public.

    Learn More


    201212-0.5 mi S of E 41st St S on S 241st E Ave
  • 305th E of 51st

    Description: Road Project - Resurfacing

    In Progress

    Problem: The road was subject to flooding and damage during rain.

    Solution: Elevated road and fixed damage resulting in a safer road for commute.

    Learn More


    201206-E 51st St S from S 305th E Ave for 0.5 mi E
  • 41st Between 257th & 273rd

    Description: Bridge Project

    Completed 2012

    Problem: The bridge was subject to flooding and erosion during rain.

    Solution: Re-built the Bridge which prevented flooding and damage.

    Learn More


    201212-0.4 mi E of S 257th E Ave on E 41st St S
  • Coal Creek Bridge - (273rd Oak Grove)

    Description: Bridge Project

    Completed 2011

    Problem: Coal Creek Bridge began to fall apart and became dangerous for commuters.

    Solution: Re-built Coal Creek Bridge resulting in a safer commute for emergency vehicles, school busses, and constituents.

    Learn More


    201106-1.7 mi N of Muskogee Turnpike on S 273rd E Ave
  • 305th And 8th Salt Creek Bridge

    Description: Road Project

    Delayed

    Problem: Bridge is functionally obsolete.

    Solution: Currently working with engineers and a design is in progress. Our hopes are to widen and lengthen the bridge to accomodate the creek.

    Learn More


    201312-1.3 mi N of E 21st St on S 305th E Ave
  • Lonestar / 71st And 121st Roadway

    Description: Road Project

    Completed 2013

    Problem/Solution: Roadway improvement / agg base lay down this project was completed in August of 2013.

    Learn More


    201312-E 121st St S and S 353rd E Ave
  • Spunky Creek Bridge - Admiral West of 209th

    Description: Road Project

    Completed 2011

    Rebuilt for flood prevention and better commuting for citizens and emergency vehicles

    Learn More


    201312-0.8 mi W of Creek Turnpike on E Admiral Pl
  • 21st and 280th

    Description: Road Project

    Completed 2013

    Problem: Road was extremely uneven and rough.

    Solution: Road was asphalted to create a smoother drive.

    Learn More


    20140411-E 21st St and S 280th E Ave
  • 31st / 289th Verdigris Mountain Estates

    Description: Road Project

    Completed 2011

    Resurfaced to improve travel for residence, buses and emergency vehicles.

    Learn More


    201312-E 31st St and S 289th E Ave
  • 52nd And 281st

    Description: Road Project

    Completed 2011

    The roadway was widened and resurfaced for safer travel.


    Learn More


    201312-E 52nd St from S 281st E Ave to endOfRoad
  • 71st and 293rd (295th?) Woodland Hills Addition

    Description: Road Project

    Completed 2013

    Woodland Hills Addition completed in 2013 the county micro sealed the addition for roadway improvements.

    Learn More


    201312-E 71st St S and S 295th E Ave
  • 101st And 289th E. Ave

    Description: Road Project

    Completed 2012

    Problem: The road was narrow, functionally obsolete, had improper drainage, and did not have a base. The area was also overgrown with trees and shrubs.

    Solution: The road was widened, built up wiht proper road materials, and drainage was fixed. The overgrown trees and shrubs were also cleared out providing a safer road for emergency vehicles, school buses, and constituents.

    Learn More


    201312-E 101st St and S 289th E Ave
  • 101st Between 305th And 353rd

    Description: Road Project

    Completed mid 2013

    Problem: Several pot holes and uneven roadway.

    Solution: 101st was chip and sealed for improvements.

    Learn More


    201312-E 101st St S between S 305th E Ave and S 353rd E Ave
  • 111th Between 305th And 353rd

    Description: Road Project

    Completed mid 2013

    Problem: Several pot holes and uneven roadway.

    Solution: 111th was chip and sealed for improvements.

    Learn More


    201312-E 111th St S between S 305th E Ave and S 353rd E Ave
  • 25th and 305th

    Description: Road Project

    Completed 2011

    Problem: Bridge was previously a box culvert and lacked proper flowage..

    Solution: ODOT re-constructed bridge for a better flowage and smoother surface.

    Learn More


    20140411-0.5 mi S of E 21st St on S 305th E Ave
  • 41st From 241st - 257th

    Description: Road Project

    Completed mid/late 2012

    Problem: Roadway was in need of a smoother overlay due to multiple pot holes.

    Solution: Overlayed road with ashpalt for a safer travel.

    Learn More


    20140411-E 41st St S from S 241st E Ave to S 257th E Ave
  • 81st From 273rd - 305th

    Description: Road Project

    Completed 2011

    Problem: Roadway was in need of a smoother overlay due to multiple pot holes.

    Solution: Overlayed road with asphalt for a safer travel.

    Learn More


    20140411-E 81st St S from S 273rd E Ave to S 305th E Ave
  • 91st and 305th

    Description: Road Project

    Completed 2012

    Problem: Roadway is very narrow with overgrown trees.

    Solution: Trimming bad trees building up the roadway and widening with a chip and oil overlay.

    Learn More


    201312-E 91st St N and S 305th E Ave
  • 353rd From 71st - 121st

    Description: Road Project

    Completed 2013

    Problem: Several poor spots throughout roadway.

    Solution: Repaired by asphalting roadway.

    Learn More


    20140411-S 353rd E Ave from E 71st St S to E 121st St Se
  • 71st From 369th - 385th

    Description: Road Project

    Completed 2011

    Problem: Previously was chipped and oiled but has been worn down through time.

    Solution: Rechipped and oiled roadway.

    Learn More


    20140411-E 71st St S from S 369th E Ave to S 385th E Ave
  • 301st North Of 81st

    Description: Road Project

    Completed 2012

    Problem: Roadway was previously all gravel.

    Solution: Chipped and Oiled roadway for a smoother surface.

    Learn More


    20140411-S 301st E Ave from E 81st St S for 0.5 mi N
  • 273rd From 31st - 71st

    Description: Road Project

    Completed 2011

    Problem: Roadway had multiple pot holes and was unlevel.

    Solution: Street was Micro Sealed to improve with a leveled surface.

    Learn More


    20140411-S 273rd E Ave from E 31st St to E 71st St S
  • 287th South Of 101st

    Description: Road Project

    Completed 2012

    Problem: Road was extremely narrow and had multiple deep potholes.

    Solution: Road was asphalted for a smoother surface and also widened to help traffic flowage.

    Learn More


    20140411-S 287th E Ave for 0.2 mi S of E 101st St S
  • 104th West Of 289th

    Description: Road Project

    Completed 2012

    Problem: Roadway was in poor condition.

    Solution: Chipped and Oiled roadway, and then was Asphalted for a smoother surface..

    Learn More


    20140411-E 104th St S for 0.4 mi W of S 289th E Ave
  • 305th From 71st - 111th

    Description: Road Project

    Completed 2014

    Problem: Roadway had several poor spots that were worsening.

    Solution: Street was asphalted.

    Learn More


    20140411-S 305th E Ave from E 71st St S to E 111th St S
  • 305th From 71st To 51st

    Description: Road Project

    Completed Jun 2014

    Problem: Roadway was deteriorating due to high traffic.

    Solution: Asphalted and striped roadway to make a safer travel.

    Learn More


    201406-S 305th E Ave from E 51st St S to E 71st St S
  • 337th between 61st and 71st

    Description: Road Project

    Completed 2013

    Problem/Solution: Once we chip and oiled the roadway for road improvements and that as well is completed in July of 2013.
    Learn More


    201306-S 337th E Ave between E 61st St S and E 71st St S
  • 31st From 193rd To The Creek Turnpike


    Description: Road Project

    Complete

    Problem: Roadway had several poor spots.

    Solution: Roadway was re-asphalted.

    Learn More


    201405-E 31st St from S 193rd Ave E to Creek Turnpike
  • 111th From 353rd To 369th

    Description: Road Project

    Completed 2014

    Problem: Roadway was very narrow and had several poor spots.

    Solution: Roadway was chip and oiled as well as widened for a safer travel.

    Learn More


    201408-E 111th St S from S 353rd E Ave to S 369th E Ave
About OK.gov | OK.gov Policies | Accessibility 
© The State of Oklahoma
Follow us On:
Twitter Facebook

Dialog Title

The following x errors were detected in the information you entered.

    Please correct these errors and try again.

    There is an error in the information you entered.

    Please try again.