Skip to Search Skip to Content
  • Share
    • Email to a Friend
    • Subscribe to eGov News
    • Blinklist
    • Blogger
    • Del.icio.us
    • Digg
    • Facebook
    • Google Bookmarks
    • Linked In
    • Myspace
    • Stumble Upon
    • Twitter
    • Yahoo Bookmarks
  •  | 
  • Print
More Information
  FAQ  | Contact  | Notifications  | Site Index  | Calendar  | RSS Feeds
Wagoner County
Visit OK.gov
  • Elected Officials
  • Emergency Services
  • Planning and Zoning
  • Courts
  • Boards, Trusts & Commissions
  • About Wagoner County
Home / Map Viewer
Map Viewer Home |  Log In

D2 - Road and Bridge Projects - old

Browse All |  By Type |  By Department |  By Topic |  By Category |  By Name

D2 - Road and Bridge Projects - old


SELECT AN ICON FOR DETAILS
Map Canvas


Legend

Road PlanningRoad inWorkRoad CompletedBridge PlanningBridge inWorkBridge Completed


MAP DETAILS
  • mapRight
    mapRight
  • New Bridge - 0.2 mi E of N4230 Rd on E0720 Rd

    Description: New bridge constructed on 720 Rd approximately 1/6 mile east of 230 Rd.

    Completed: 2010

    201006-0.2 mi E of N4230 Rd on E0720 Rd
  • Flat Rock Creek Bridge - 0.3 mi S of E0670 Rd on S 428

    Description: New bridge constructed on S 428 approximately 1/3 mile south of 670 Rd.

    Completed: 2012

    201312-0.3 mi S of E0670 Rd on S 428
  • Railroad Creek Bridge - 0.5 mi W of SH-16 on E0790 Rd

    Description: New bridge constructed on 790 Rd approximately 1/2 mile west of SH-16.

    Completed: 2012

    201106-0.5 mi W of SH-16 on E0790 Rd
  • E0710 Rd from N4260 to N4270 west-of-the-railroad-tracks

    Description: Road Project - Resurfacing east 710 road from north 260 road to north 270 road (west of the railroad tracks)

    Completed 2013

    201312-E0710 Rd from N4260 to N4270 west-of-the-railroad-tracks
  • E0705 Rd from N Pierce Ave to end-of-road

    Description: Road Project - Resurfacing east 705 Rd from N Pierce Ave to the end of the road

    Completed 2013

    201312-E0705 Rd from N Pierce Ave to end-of-road
  • S 428 from 0.5 mi N of E0690 Rd to NW 16th St

    Description: Road Project - Resurfacing east 690 road from 1/2 mile north of 690 road to NW 16th street

    Completed 2013

    201312-S 428 from 0.5 mi N of E0690 Rd to NW 16th St
  • E 121st St S and S 289th E Ave

    Description: The intersection is being widened.

    Completed Feb 2014

    201402-E 121st St S and S 289th E Ave
  • New Bridge - 0.2 mi E of N4250 Rd on E0720 Rd

    Description: New bridge construction

    In Work

    Tasks...pillars set, beams set, put decking down and steel in deck, pour concrete deck, road dirt work

    201401-0.2 mi E of N4250 Rd on E0720 Rd
  • Toppers Road from Blueridge to Willow

    Description: Cutting trees.

    In Work

    201401-Toppers Rd from Blueridge to Willow
  • Whitehorn Cove Rd from Whitehorn Fire Station to 0.5 mi NW

    Description: Cut down trees, improved shoulder, installed 2000 feet of guardrail.

    Completed Dec-2013

    201401-Whitehorn Cove Rd from Whitehorn Fire Station to 0.5 mi NW
  • Whitehorn Cove Rd from Orchard Lane for 1.0 mi E

    Description: Tree removal.

    Completed Dec-2014

    201401-Whitehorn Cove Rd from Orchard Lane for 1.0 mi E
  • N4220 Rd from E0650 Rd (County Line) to E0730 Rd (SH-51)

    Description: Road Project - 8 miles - currently acquiring right-of-way

    In Work

    Future tasks... blacktop the road, dirt work and back-sloping, drainage improvement.

    201401-N4220 Rd from E0650 Rd (County Line) to E0730 Rd (SH-51)
  • N 49th St E from 251A to E 60th St N

    Description: Road Project - oil and chip

    Completed 2013

    201401-N 49th St E from 251A to E 60th St N
  • N 40th St E from SH-16 to E 60th St N

    Description: Road Project - new asphalt

    201401-N 40th St E from SH-16 to E 60th St N
  • Gibson Station above Evergreen Cemetery on SH-16

    Description: Road Project - oil and chip

    Completed: Aug-2013

    201401-Gibson Station above Evergreen Cemetery on SH-16
  • Gray Oak Grove - N4340 Rd and Gray Oaks Rd

    Description: Road Project

    In Planning Stage

    Tasks...
    - obtained grant to improve drainage and widen road
    - waiting for state to approve Lake Access funds
    - if funds not approved, then oil and chip

    201401-Gray Oak Grove - N4340 Rd and Gray Oaks Rd
  • Bull Creek Bridge - 0.3 mi E of N4225 Rd on E0660 Rd

    Description: New bridge constructed on east 660 Rd approximately 1/3 mile east of 225 Rd.

    In Planning Stage

    Current task: Survey and working with ODOT.

    201312-0.3 mi E of N4225 Rd on E0660 Rd
  • E 710 Rd between S 220 Rd and S 210 Rd

    Project Type: Oil and Chip
    Work Status: In Work
    Reason Work Was Needed: To improve the road surface because of increased traffic and the increased number of home owners.
    Description of Work: Stabilized road base with soil stabilizers then three layers of oil and chip.

    201406-E0710 Rd between S 220 Rd and S 210 Rd
  • Skyview Addition in Coweta SH. 51 & 127th

    Project Type: Road resurfacing / Micro surfacing
    Work Status: Planning
    Reason Work Was Needed: To preserve the asphalt roads in that addition and to increase the longevity and to minimize the time and maintenance required to do so.
    Description of Work: Micro surfacing.

    201406-SH-51 and E 127th St S
  • Deer Crossing off of 353rd E Ave (Lone Star Rd.) & 142nd St.

    Project Type: Road resurfacing / Micro surfacing
    Work Status: Planning
    Reason Work Was Needed: To improve and to preserve the condition of the roads.
    Description of Work: Micro surfacing.

    201406-353rd E Ave and 142nd St - Deer Crossing
  • Skyview Addition in Coweta SH. 51 & 127th

    Project Type: Road resurfacing / Micro surfacing
    Work Status: Planning
    Reason Work Was Needed: To preserve the asphalt roads in that addition and to increase the longevity and to minimize the time and maintenance required to do so.
    Description of Work: Micro surfacing.

    201406-SH-51 and E 127th St S
  • E 760 Rd from Hwy 16 to Hwy 69

    Project Type: Oil and Chip
    Work Status: In Work
    Reason Work Was Needed: To improve the road because of increased traffic.
    Description of Work: Stabilized road base with soil stabilizers then three layers of oil and chip..

    201406-E0760 Rd from SH-16 to SH-69
  • E 100th St N. Gray Oaks Rd from N 49th St to Hwy 16

    Project Type: Road widening, Road resurfacing
    Work Status: Planning / In Work
    Reason Work Was Needed: To improve driver safety by widening for residents and State Park Campers.
    Description of Work: Widen the road then three inch overlay.

    201406-E 100th St N from North 49th St E to SH-16
About OK.gov | OK.gov Policies | Accessibility 
© The State of Oklahoma
Follow us On:
Twitter Facebook

Dialog Title

The following x errors were detected in the information you entered.

    Please correct these errors and try again.

    There is an error in the information you entered.

    Please try again.